Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Contact Us
English (US)
US English (US)
FR French
DE German
  • Home
  • Satos
  • User Interface | Controls | Functions | Handling

Initial commissioning

Written by Axel Schmidt

Updated at May 15th, 2023

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Satos
    Safety Instructions – read before use | Environment Firmware update Satos User Interface | Controls | Functions | Handling Technical Data Remote control | Flash triggering Power supply | Battery Maintenance | Repair | Consumables | Spare parts | Guarantee Accessories Charging station for up to 4 slide-in batteries
  • Pulso L
    Safety Instructions – read before use | Environment Firmware update Pulso L User Interface | Controls | Functions | Handling Technical Data Maintenance | Repair | Consumables | Spare parts | Guarantee Accessories
  • Siros S
    Safety Instructions – read before use | Environment Firmware update Siros S User Interface | Controls | Functions | Handling Technical Data Remote control | Flash triggering Power supply Maintenance | Repair | Consumables | Spare parts | Guarantee Accessories
  • Siros L
    Safety Instructions – read before use | Environment Firmware update Siros L User Interface | Controls | Functions | Handling Technical Data Remote control | Flash triggering Power supply | Battery Maintenance | Repair | Consumables | Spare parts | Guarantee Accessories
  • Scoro E + S
    Safety instructions - read before use | Environment User interface | Controls | Functions | Handling Technical Data Remote control | Flash triggering Maintenance | Repair | Consumables | Spare parts | Guarantee
  • Move 1200 L
    Safety Instructions – please read before use | Environment Firmware update Move User Interface | Functions | Handling | Controls Technical Data Remote control | Flash triggering Power supply | Battery Maintenance | Repair | Consumables | Spare parts
  • RFS 2.1
    Safety Instructions - read before use Scope of Delivery and product overview Technical Data Operation as transmitter or receiver RFS 2.1 transceiver as transmitter Trouble shooting Accessories
  • RFS 2.2
    Safety Instructions - read before use Scope of Delivery and product overview RFS 2.2 transceiver as transmitter RFS 2.2 transceiver as receiver Technical Data Firmware Update RFS 2.2
  • RFS 3
    Safety Instructions – read before use | Environment Scope of delivery and operating elements User Interface | Controls | Functions | Handling Firmware Update RFS 3.0 Compatibility Technical Data Maintenance | Repair | Consumables | Spare parts | Guarantee Trouble shooting
  • Pulso G, Unilite and Picolite
  • LED F160
    Safety instructions - read before use | Environment Firmware Update LED F160 User Interface | Controls | Functions | Handling Technical Data Maintenance | Repair | Error Messages| Guarantee Accessories
  • Scope D50
    Videos
  • Compatibility (Lamp <-> light shaper | Lamp <-> power pack)
  • Locate your distributor or dealer
+ More
  • Satos

    • Pulso L

      • Siros S

        • Siros L

          • Scoro E + S

            • Move 1200 L

              • RFS 2.1

                • RFS 2.2

                  • RFS 3

                    • Pulso G, Unilite and Picolite

                      • LED F160

                        • Scope D50

                          • Compatibility (Lamp <-> light shaper | Lamp <-> power pack)

                            • Locate your distributor or dealer

                              Table of Contents

                              Warning: Attention:

                              Warning:

                              It is mandatory to comply with the safety instructions supplied!

                               

                               

                              https://broncolor.swiss/safety

                               

                              All protective transport materials must be removed.

                               

                              Read the complete Safety Instructions article here:

                              https://broncolor.helpjuice.com/en_US/safety-instructions-%E2%80%93-read-before-use-%7C-environment_satos/safety-instructions_satos-en

                               

                               

                              Power supply operation

                               

                              All Satos power packs are equipped with a multi-voltage version as a standard. The devices automatically align to the current power supply voltage. The Satos power packs provide a constant 1600J or 3200J for all operating voltages (100 - 240V). 

                               

                              Attention:

                              Please note that the modeling light's operating voltage must correspond to the local mains voltage (max. 650W at 200-240V resp. 300W at 100-120V).

                              Note: Broncolor has been supplying only 300W modeling lights since November 2019.

                               

                               

                              Satos must not be powered via PoE (Power over Ethernet).

                                       

                              Grounded power supply network system

                              Always connect the device to the power supply with an earthed power supply unit.

                               

                               

                               

                               

                              Device configuration

                               

                              Insert at least one plug-in power supply unit or a plug-in battery into the slot provided for this purpose. The power cable must also first be plugged into the Satos and then connected to an appropriate power supply socket if the rechargeable batteries are to be recharged during operation; a plug-in power supply unit is required.

                               

                              Please read the following chapter "Power Management" to learn how to configure your Satos device perfectly to your individual needs.

                               

                               

                              commissioning initializing

                              Was this article helpful?

                              Yes
                              No
                              Give feedback about this article

                              Related Articles

                              • Control panels
                              • Ports

                              Copyright 2025 – broncolor.

                              Knowledge Base Software powered by Helpjuice

                              Expand